TECHNICAL DATA:
Consistency: liquid
Colour: brown
Waiting time between each coat: minimum 40 minutes, maximum 2 hours
Waiting time before laying directly with polyurethane or epoxy-polyurethane adhesive: minimum 2 hours, maximum 24 hours
Waiting time before laying directly with water-based adhesive: minimum 2 hours, maximum 24 hours
Waiting time before successive treatments on final coat (blended with sand): minimum 2 hours
Loss of Tack: after 30-40 minutes
Set to light foot traffic: 60 minutes
Storage: 12 months.
Application: roller. brush or flat trowel
Consumption: 0.20-0.40 kg/m² per coat
Packaging: 10 kg drums