TECHNICAL DATA:
Workability time: 30-40 minutes.
Thickness applied: from 3 to 40 mm.
Set to light foot traffic: approx. 4 – 6 hours.
Waiting time before laying: 1 – 3 days depending on thickness
Application: trowel
EMICODE : EC1 R Plus – very low emission.
Green Star™: very low VOC content (g/l) – contributes valuable points towards Green Star™ credits
Colour: Grey
Storage: 12 months.
Consumption: 1.8 kg/m² per mm of thickness.
Packaging: 20 kg bags.